3A NORTHEAST TRANSFER STATION

Transfer station complete
Transfer station finished 2
Transfer station done
Northeast transfer station
Transfer roof
Transfer station 3
Transfer station wood
Transfer station foxblocks
Transfer station foxblocks close up
Transfer station in progress
Transfer station chair
Transfer station pait
Transfer station drone pic
Transfer station working
Location: Miami, Fl
Square Footage: 8,000 (overall) 6,200 (Fox Blocks)
Owner/Developer: Miami Dade County

Building designed to exceed Miami-Dade storm resistance requirements for all new structures. Advance HVAC system included to minimize energy cost impacts. Building performed as expected thru Hurrican Irma.

This mixed use project includes offices and drop off facilities for waste and recycling. Its creative design provides function for office occupants and for separating out daily consumer discarded items. Pier columns and steel framing was incorporated and attached to ICF to support a handsome steel canopy for this 8,000 square foot municipal building.

Transfer station complete

Attention to strict tolerances was enabled with lasers, string lines and Giraffe bracing that made the walls very straight and strong. The structure faired very well during a recent hurricane to the pleasure of the owners.

Project Stats

LocationMiami, FL
Square Footage8,000 (overall) 6,200 (Fox Blocks)
Owner/DeveloperMiami Dade County
General ContractorTC&F Builders
ICF DealerTurning Leaf Construction
ICF ContractorTurning Leaf Construction
ArchitectTSAO Design
Structural EngineerArvelo and Associates
DistinctionLEED intended
510x333-2

READY TO TALK?

Click here to book your consultation with a Fox Blocks ICF expert.

Let's Connect