Exterior 2 496x280
Keep Calm - That School Was Built With ICFs
Insu­lat­ed Con­crete Form wall sys­tems, Fox Blocks, are a way to cre­ate an extreme­ly safe struc­ture. When teach­ers and stu­dents return to an ICF school, they are pro­tect­ed against these ele­ments.
Medical building construction
The Benefits of Building a Medical Facility with ICF Construction
56261889297 145 B21 EA 1 D5 D 4310 A77 B 612 D857 E61 AE
ICF vs. Steel Framing: Which Is Best For Commercial Construction?
ICFs have been used with great suc­cess for projects such as hotels, the­atres, mul­ti-sto­ry res­i­den­tial, office, retail, mixed-use retail, edu­ca­tion­al projects and all man­ner of pub­lic works and fed­er­al mil­i­tary appli­ca­tions. How­ev­er, some peo­ple argue that Steel Fram­ing is best for com­mer­cial con­struc­tion, so we decid­ed to get to the bot­tom of the ICF vs. Steel Fram­ing face-off.
Image14
16 ICF Modern Farmhouse Floor Plans and Design Ideas
Icf homes minnesota 1
Insulating Your Dreams: Unraveling the Benefits of ICF Homes in Minnesota
What is the typical Interior finish on an ICF?

All build­ing codes in the USA and Cana­da spec­i­fy that plas­tic insu­la­tion (EPS) must be cov­ered by a ther­mal bar­ri­er equiv­a­lent to 15 min­utes of fire pro­tec­tion in hab­it­able spaces. This is achieved with ½” gyp­sum board or an equiv­a­lent mate­r­i­al. Fox Blocks has spe­cif­ic fire test­ing that proves reg­u­lar ½” gyp­sum board with reg­u­lar dry­wall screws fas­tened into the plas­tic webs remains on the wall for the required 15-minute time peri­od.

How do I apply traditional stucco to an ICF?

Tra­di­tion­al stuc­co has a thick cemen­ti­tious base, typ­i­cal­ly installed over a met­al lath. The met­al lath is fas­tened direct­ly to the Fox Blocks webs with screw or sta­ples.

ICFMA CAN Type 9 Prescriptive Engineering Manual

Is an ICF house faster to build?
The assem­bly and place­ment of con­crete may take the same time as to build with con­ven­tion­al meth­ods. The advan­tage with Fox Blocks is that the walls are now insu­lat­ed, have a vapor and air bar­ri­er installed and are ready for fin­ish­es once the win­dows and roof are installed. These ben­e­fits will save weeks and/​or months depend­ing on the size of the projects.