22 story finished 1
“22 STORY” STUDENT DORMITORY
This 104,000 square foot project won an ICF Builder Award.
Insulated Concrete Form manufacturer of Fox Blocks is exhibiting at AIA National Convention: New Orleans: May 12-14
Fox Blocks is exhibit­ing at the AIA Nation­al Con­ven­tion being held here in New Orleans now through May 14th.
Fox Blocks at Federal Asset Management Policy Forum and Expo
Fox Blocks Vice Pres­i­dent Mike Ken­naw and East Coast Sales Man­ag­er Bri­an Med­ford par­tic­i­pat­ed in the 3rd Annu­al Fed­er­al Asset Man­age­ment Pol­i­cy Forum and Expo in the Wash­ing­ton, D.C. area the week of Octo­ber 17, 2016.
2014 THE PRESERVE AT MOUNTAIN VISTA 14
THE PRESERVE AT MOUNTAIN VISTA
A series of homes were built togeth­er to prove the via­bil­i­ty of ICF con­tribut­ing to afford­able, Net Zero homes.
When can I backfill the foundation wall?
The con­crete must cure for a min­i­mum of 7 days and the foun­da­tion wall must be lat­er­al­ly sup­port­ed, mean­ing the floor sys­tem is installed sup­port­ing the top of the wall. All below grade water­proof­ing / damp­proof­ing must be installed.
2016 MILTON RESIDENCE 6
MILTON RESIDENCE
The own­ers want­ed an afford­able cus­tom home that could with­stand Chesa­peake Bay weath­er.
2018 ST JUAN DIEGO 13
ST. JUAN DIEGO
The church fea­tures unique win­dows that were accom­mo­dat­ed in the Fox Blocks struc­tur­al wall sys­tem.
Image2
26 ICF Builders & Contractors to Consider for Your Construction Needs
2016 MESKWAKI TRAVEL PLAZA 9
MESKWAKI TRAVEL PLAZA
The Meskwa­ki Trav­el Plazais a full-ser­vice trav­el cen­ter includes a truck­ers’ lounge, con­ve­nience store, and 50’s themed din­er.