Copy of Ashbury Hills Exterior 4
ASHBURY HILLS ELEMENTARY SCHOOL
Ash­bury Hills Ele­men­tary School is the first com­plete school built with ICFs in the state of Nebras­ka, and its gym­na­si­um was built to full height with Fox Blocks.
Businessmen collaboration cooperation 886465
Airlite Plastics Co. - Fox Blocks ICF Acquires TRUEGRID
Paves way for accel­er­at­ed growth in sus­tain­able con­struc­tion prod­ucts.
Fox 4
21 Construction Techniques to Build a Small, Sustainable, Eco-Friendly Home
Fox Blocks Acquiring Key Assets of ARXX Building Products
Fox Blocks ICF announced that it will acquire select key assets from ARXX Build­ing Prod­ucts, inte­grat­ing those assets into its own oper­a­tions and aug­ment­ing the Fox Blocks Insu­lat­ed Con­crete Form (ICF) prod­uct line.
Screen Shot 2024 02 05 at 8 54 33 AM
How Long Does It Really Take to Build a House?
Whether you’re build­ing your dream home or a cozy cot­tage, know­ing the time­line is essen­tial. How­ev­er, one of the first ques­tions that come to mind is, How long will it take to turn these blue­prints into my home?” Under­stand­ing the time­line is cru­cial for plan­ning, bud­get­ing, and ulti­mate­ly enjoy­ing the process of watch­ing your house come to life.
Structural Insulated Panels SI Ps Vs Insulated Concrete Forms IC Fs Header
Structural Insulated Panels (SIPs) Vs. Insulated Concrete Forms (ICFs)
Home Climate Control
Home Climate Control: How to Prepare for When the Power Goes Out
Image1
The New Basement: A Modern Housing Innovation
Base­ments are no longer a scary, damp, and musty area. Learn about the new base­ment and how it has become the mod­ern hous­ing inno­va­tion it is today.
ICFs and Severe Weather
The steel rein­forced con­crete, which can cure stronger than nor­mal con­crete because of the foam insu­la­tion, can with­stand winds of over 200 MPH, and pro­jec­tile debris trav­el­ing over 100 MPH. There are dozens of eye wit­ness exam­ples of ICF homes tak­ing EF5 tor­na­does head on with the walls still stand­ing.
Remove Costs on your ICF Project
Two proven areas to remove costs are cor­ners and truss wire.