Insulated Concrete Form Estimator
Fox Blocks Estimator PRO4 is now LIVE and available to download and use for project take offs and estimates! Estimate ICF quantities including specialty blocks, opening material, ancillary products, lineal feet of rebar, volume of concrete and man hours for a specific job.
KAYDEN'S PLACE
Community and Charity Bring Kayden a Special Backyard Oasis. Kayden’s Place is a water feature, pool and playground that provides Kayden, a 12-year-old boy with a very rare genetic disease, with a backyard adventure that contributes to his sensory and cognitive development.

SHOWBIZ CINEMA
With theaters, a bowling alley, dining, and an arcade, Homestead Station is the centerpiece of Homestead’s downtown revitalization. The owner wanted a durable, high-performance building to house their proprietary theater experience featuring 3D surround sound, massive screens, and premium reclining seats.

ALACHUA COUNTY TAX COLLECTOR'S OFFICE
Eco-Friendly Space to Serve the Public. The Alachua County Tax Collector’s Office is a welcoming space with staff and clients at the forefront of design.

Improve the Comfort and Health of a Building with Soundproof Exterior Walls
The need to incorporate soundproofing features in the exterior walls of today’s homes and buildings has increased in recent decades. Urbanization, population growth, and an increase in air, rail, and highway traffic all have contributed to a widespread escalation of noise pollution.

GRAND ODYSSEY THEATRE
The owners of the Grand Odyssey Theatre aimed to bring a modern theatre experience with state-of-the-art amenities to Watertown, South Dakota.

What is the Cost to Build an ICF Pool?


ORMAN RESIDENCE
The designers and construction team were charged with creating a sustainable 7,500 sq. ft. modern estate atop a stunning hill overlooking ranches and vineyards in Murrieta, California.

WINTERSET COMMUNITY CHURCH ADDITION
Winterset Community Church wanted a larger gathering space for the local community, so they decided to add a gymnasium to their worship building. The addition had to be built quickly while the church was still in use, blend in seamlessly with the existing structure, and offer high noise protection between the church and the gymnasium.