Terms and Conditions
Building Your ICF Home - Concrete
How to Build Multi-Story Buildings Faster
Whether it’s a high-rise residential apartment building or a commercial complex, the quicker a multi-story building is constructed, the sooner it can start generating revenue.
1.14.06 Concrete Pre-Placement Checklist
The Integrated Design Process (IDP) and Insulated Concrete Forms (ICFs)
Building for the Future: Exploring ICF Construction in Washington State
New Training for the Fox Block Interlock
We have found it to be a waste of time and energy to attempt to offset or stagger the block as in the photo to the left. By creating a vertical stacked seam you will be more accurate with the job dimensions and will increase your profit by gaining efficiency.
1.01.10 Energy Stick / Insert Panel
Building a Disaster-Resistant School With Insulated Concrete Forms
Does EPS absorb water?
No, EPS is a closed cell foam and does not act like a sponge or absorb water.