How to Get Energy-Efficient Walls with Insulated Concrete Forms
1.15.01 Compatible Products
How to Build a 4-Hour Fire Wall: Thickness, Materials, and Assembly
KRAFTHAUS
The Krafthaus home was built in the plains of Black Forest, Colorado which meant a high water table (4’ below grade), poor soil quality, and weather conditions that included high wind gusts and snow drifts up to 5 feet tall.
MAYURA MANOR
Deadlines and Design Codes Don’t Stop A Dream Home. A striking front elevation is met with highly-efficient sustainable features and includes a courtyard connecting the main home, casita and garage, with custom stone water features elevated above the pool deck.
When can I backfill the foundation wall?
The concrete must cure for a minimum of 7 days and the foundation wall must be laterally supported, meaning the floor system is installed supporting the top of the wall. All below grade waterproofing / dampproofing must be installed.
Can I leave Fox Blocks forms exposed to ultraviolet rays for an extended period (months)?
Yes, but you will notice a light dusting on the surface and a yellowing discoloration of the forms. This does not indicate any detrimental effects to the ICFs. We do suggest, that if the exterior finish is not going to be installed within around a 3 month period or more, the forms be protected from UV rays by installing a temporary building wrap type material. The powdery film must be removed with soap and water before the application of a synthetic stucco finish or waterproofing membrane.
The Best Vapor Systems for Basement Walls
21 Construction Techniques to Build a Small, Sustainable, Eco-Friendly Home
MAIN STREET OFFICE BUILDING
This eco-friendly project demonstrates the multiple green construction methods available.