Screen Shot 2020 01 06 at 8 33 28 AM
How ICF Reduces Production Time and Costs When Building a Movie Theater
ICF con­struc­tion expe­dites the pro­duc­tion of a movie the­ater and reduces labor costs over both wood-frame and CMU con­struc­tion.
7 Problems with Wood Frame Construction 1
7 Problems with Wood Frame Construction
Sev­en spe­cif­ic prob­lems with wood frame con­struc­tion include fire- and wind-resis­tance, dura­bil­i­ty, low ther­mal mass, shrink­age, and com­pro­mised acoustics and indoor air qual­i­ty (IAQ).
Fox 4
Florida ICF Homes are Energy-Efficient, Storm-Proof, and Durable
Remove Costs on your ICF Project
Two proven areas to remove costs are cor­ners and truss wire.
Fox3
6 Alternative Building Materials for 2019
DSC06285c
ACADIA COLONY POTATO BARN
Fox Blocks ICF offered an ener­gy-effi­cient solu­tion for a build­ing full of pres­sur­ized mois­ture because mois­ture does not affect the ICF, even over the long term. Pota­to stor­age is at a con­stant 100% rel­a­tive humid­i­ty and 1.5 cfm pres­sure, which caus­es oth­er forms of con­struc­tion to go through com­plex detail­ing to keep mois­ture out of the wall cav­i­ty.
Screen Shot 2020 01 16 at 12 36 31 PM
4 Defining Characteristics of High-Performance Buildings
High-per­for­mance build­ings also pos­i­tive­ly impact the envi­ron­ment and pro­vide finan­cial ben­e­fits before and after con­struc­tion.
Image4
Comparing Costs of Concrete Block vs Wood Frame Construction and a Better Alternative to Both