PHNX1/PALOS RESIDENCE
First Type II Non-Combustible, Net-Zero Home in the U.S. This home was designed, built and completed in less than 21 months with the same cost as a traditional build.
1.10.04 LEED NCv4
1.18.01 Installer Training and Qualifications (Spanish)
1.18.01 Installer Training and Qualifications (FRENCH)
1.14.10 Field Guide Checklist - Pocket - French
1.14.10 Field Guide Checklist - Pocket - Spanish
1.02.01 Installation Checklist
1.05.10A Canadian Prescriptive Engineering ICFMA-1
WINTERSET COMMUNITY CHURCH ADDITION
Winterset Community Church wanted a larger gathering space for the local community, so they decided to add a gymnasium to their worship building. The addition had to be built quickly while the church was still in use, blend in seamlessly with the existing structure, and offer high noise protection between the church and the gymnasium.