1.01.15 4" Height Extender
1.06.02 Concrete Lifts and Fall Heights
Fox Blocks ICF Setting forms with hammer on full height web
Fox Blocks rip cuts for floor or roof heights on insulated concrete forms
Why is the concrete limited to a placement height or lifts of 4 feet (1.2 m)?
To alleviate the pressure from the liquid concrete, the concrete is placed in layers or ‘lifts’. The first lift is limited to 4′ (1.2 m) of concrete around the perimeter of the building. This allows approximately one hour for the concrete to set-up before continuing with the next 4′ (1.2 m) lift. The lower lift provides support for the next lift as the concrete is placed continuously around the building in consecutive lifts to the top of the wall.
1.03.02 Vertical Coursing
1.02.10 Field Cut Blocks
GEORGETOWN INDEPENDENT SCHOOL DISTRICT
Ashbury Hills Elementary School is the first complete school built with ICFs in the state of Nebraska, and its gymnasium was built to full height with Fox Blocks.
ASHBURY HILLS ELEMENTARY SCHOOL
Ashbury Hills Elementary School is the first complete school built with ICFs in the state of Nebraska, and its gymnasium was built to full height with Fox Blocks.
KAYDEN'S PLACE
Community and Charity Bring Kayden a Special Backyard Oasis. Kayden’s Place is a water feature, pool and playground that provides Kayden, a 12-year-old boy with a very rare genetic disease, with a backyard adventure that contributes to his sensory and cognitive development.