Can masonry be installed on the exterior walls?
Yes, Fox Blocks has a brick ledge form and the xLer­a­tor ledge rein­force­ment that is designed to sup­port mason­ry. Fox blocks also has a tieKey acces­so­ry which is a specif­i­cal­ly made as a mason­ry tie, to be insert­ed through the form into the con­crete.
Can I install a 16' garage door and / or large openings in a concrete wall?
Yes, if the fol­low­ing cri­te­ria is avail­able for the design of a con­crete lin­tel (beam) over the open­ing – con­crete lin­tel depth min­i­mum 16″ (400 mm) or more with no point loads. Larg­er open­ings would require an engi­neered design.
What size and how much steel reinforcement is required in an ICF?

Fox Blocks walls are designed as rein­forced con­crete walls, with steel rein­force­ment bars spec­i­fied to be installed ver­ti­cal­ly and hor­i­zon­tal­ly, as the walls are built. Typ­i­cal rein­force­ment bar sizes used are #4 or #5 (10 m or 15 m).

How do I protect the ICFs below grade?

All ICF walls below grade, that have hab­it­able space on one side (base­ment), must have a water­proof­ing / damp­proof­ing mem­brane installed. For walls that do not have hab­it­able space on one side (crawl space, frost walls, etc.) the EPS can be left exposed to the earth. The EPS will not dete­ri­o­rate when exposed to the earth.

When can I backfill the foundation wall?
The con­crete must cure for a min­i­mum of 7 days and the foun­da­tion wall must be lat­er­al­ly sup­port­ed, mean­ing the floor sys­tem is installed sup­port­ing the top of the wall. All below grade water­proof­ing / damp­proof­ing must be installed.
Is installing ICFs a DIY project?
Fox Blocks rec­om­mends that all installers using Fox Blocks ICFs com­plete a Fox Blocks train­ing pro­gram to ensure they have a bet­ter under­stand­ing of the basics. How­ev­er, for first time installers, it is pre­ferred that a Fox Blocks trained, expe­ri­enced installer inspect the instal­la­tion pri­or to place­ment of con­crete and assist in the place­ment of the con­crete, as they are famil­iar with work­ing with con­crete and can ensure the build is struc­tural­ly sound and safe and the walls are con­sol­i­dat­ed prop­er­ly, built straight and plumb.
Is an ICF house faster to build?
The assem­bly and place­ment of con­crete may take the same time as to build with con­ven­tion­al meth­ods. The advan­tage with Fox Blocks is that the walls are now insu­lat­ed, have a vapor and air bar­ri­er installed and are ready for fin­ish­es once the win­dows and roof are installed. These ben­e­fits will save weeks and/​or months depend­ing on the size of the projects.
How does the ICF block get secured to the foundation?
The ICF blocks are held in place with either low expan­sion spray foam or a met­al starter track. The bracing/​alignment sys­tem, typ­i­cal­ly installed after the 4th course of block, also sup­ports the ICFs in place. Once the con­crete is in the wall there is no con­cern with the forms mov­ing. The con­crete is con­nect­ed to the foot­ing with rein­forc­ing dow­els.
What is a ‘blow-out’?

A blow-out’ is a break in the form, gen­er­al­ly due to the pres­sure from the liq­uid con­crete dur­ing the con­crete place­ment and/​or con­sol­i­da­tion. Fox Blocks ICFs are designed to main­tain a high safe­ty fac­tor of pres­sure from the liq­uid con­crete. Dam­aged forms or fail­ure to sup­port areas where forms have been cut leav­ing a large area of EPS between the web sup­ports may cause a blow-out. Over con­sol­i­da­tion may also cause a blow-out.

Fox Blocks rec­om­mends the Pre-Place­ment Check­list be reviewed for all wall assem­blies pri­or to the place­ment of con­crete, to find poten­tial prob­lem areas and install addi­tion­al strap­ping or sup­port to pre­vent blow-outs. Gen­er­al­ly, for an Fox Blocks form, the size of a blow-out may be lim­it­ed to the EPS between the webs, 6″ or 8″ wide by the height of one form. If a blow-out occurs, the con­crete pour moves to anoth­er area on the wall, the hole is patched by replac­ing the EPS, installing wood sup­port over the area, and then resum­ing the pour.